WELL v2, Q2 2025 — this page reflects the WELL v2, Q2 2025 addenda of the WELL Building Standard.

Official source: https://v2.wellcertified.com/en/wellv2/air/feature/4

A04 Construction Pollution Management (WELL v2, Q2 2025)

Concept: Air · Type: Precondition

Intent

Minimize the introduction of construction-related pollutants into indoor air, remediate construction-related indoor air contamination for human health and protect building products from degradation.

Summary

This WELL feature requires projects to protect indoor air quality during building construction and renovation through a combination of strategies, such as duct protection, moisture and dust management, filter replacement, and proper equipment selection.

Issue

Air pollution originating from construction and demolition works can impact the health and quality of life of people working and residing nearby and is associated with increased mortality, due to chronic obstructive pulmonary disease.1 Increased emissions of PM10 in the vicinity of construction sites are positively correlated with people's suffering from respiratory diseases.2 Building construction and renovations are primarily a source of coarse particulate matter, but they are also a source of airborne ultrafine particles.3

Evidence

The indoor air quality levels can be compromised during building construction. Care should be taken during construction to prevent dust intrusion and/or to clear the space of dust, chemical vapors and other debris to avoid significant aggravation of indoor air quality. Air duct protection, moisture and dust management, filter replacement and proper equipment selection are strategies that improve indoor air quality, by limiting the exposure to an intense contamination period.4

Requirements

A04.1 Mitigate Construction Pollution — Precondition

Applies to: All Spaces.

Meet any one of the following options:

Option 1: Manage construction pollution

For construction occurring after enrollment or the start of subscription, the following requirements are met:

Verification: Letter of Assurance – Contractor

Option 2: No construction activities

The following requirement is met:

Verification: Letter of Assurance – Owner

WELL Core:

Meet these requirements for the extent of developer build out.

References

  1. Bergdahl IA, Torén K, Eriksson K, et al. Increased mortality in COPD among construction workers exposed to inorganic dust. Eur Respir J. 2004;23(3):402-406. doi:10.1183/09031936.04.00034304
  2. Ravinder Singh, Kafeel Ahmad DCJ and MSK. Impact of Air Quality on Human Health In The Vicinity of Construction Sites in Delhi-NCR. Int J Eng Res Appl. 2014;4(8):18-26. http://www.ijera.com/papers/Vol4_issue8/Version 4/C48041826.pdf.
  3. Kumar P, Mulheron M, Som C. Release of ultrafine particles from three simulated building processes. J Nanoparticle Res. 2012;14(4):771. doi:10.1007/s11051-012-0771-2
  4. Indoor Air Quality Program. Construction and renovation generated pollutants in occupied buildings. https://www.mass.gov/service-details/constructionrenovation-generated-pollutants-in-occupied-buildings.
  5. U.S. Green Building Council. LEED BD+C: New Construction | v4 - LEED v4. 2018. https://www.usgbc.org/resources/leed-v4-building-design-and-construction-current-version https://www.usgbc.org/resources/leed-v4-building-design-and-construction-current-version.
  6. American Society of Heating Refrigerating and Air-Conditioning Engineers. ASHRAE 52.2-2017: Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size. 2017. https://www.techstreet.com/ashrae/standards/ashrae-52-2-2017?product_id=1942059.